TABLE OF CONTENT
TITLE PAGEi
DEDICATIONii
ACKNOWLEDGEMENTiii
TABLE OF CONTENTiv
CHAPTER ONE
1.1 GENERAL INTRODUCTION1
1.2 CONSEQUENCES OF SLOPE FAILURES1
CHAPTER TWO
2. 0 DETERMINATION OF POTENTIAL FAILURE GEOMETRY4
2.1.1 Plane Failure4
2.1.2 Wedge failure4
2.1.3 Step path failure4
2.1.4. Raveling failure5
2.1.5 Toppling failure5
2.2 RECOGNIZING HAZARDS6
2.2.1 Tension crack6
2.2.2 Scarps7
2.2.3 Abnormal water flow7
2.2.4 Bulges or Creep7
2.2.5 Rubble at the toe8
2.3 MONITORING EQUIPMENT8
2.3.1 Survey Network9
2.3.2 Wire line Extensometers
2.3.3 Inclinometers11
2.3.4 Piezometers13
2.3.5 Borehole Extensometers14
2.4.4 IMPLEMENTING A MONITORING PLANS15
2.5. DATA REDUCTION & ANALYSIS16
CHAPTER THREE
3.1 SLOPE STABILIZATION METHODS &PRE-PLANNEDRESPONSE
TO MOVEMENT 18
3.1.1 Let the material fail18
3.1.2 Support the material19
3.1.3Remove the hazard19
3.2. FUTURE MONITORING TECHNOLOGIES19
CHAPTERN FOUR
4.0CONCLUSION20
Busari, S. (2018). ASSESSING AND MONITORING OPEN PIT MINE. Afribary. Retrieved from https://track.afribary.com/works/assessing-and-monitoring-open-pit-mine
Busari, Saheed "ASSESSING AND MONITORING OPEN PIT MINE" Afribary. Afribary, 19 Dec. 2018, https://track.afribary.com/works/assessing-and-monitoring-open-pit-mine. Accessed 15 Nov. 2024.
Busari, Saheed . "ASSESSING AND MONITORING OPEN PIT MINE". Afribary, Afribary, 19 Dec. 2018. Web. 15 Nov. 2024. < https://track.afribary.com/works/assessing-and-monitoring-open-pit-mine >.
Busari, Saheed . "ASSESSING AND MONITORING OPEN PIT MINE" Afribary (2018). Accessed November 15, 2024. https://track.afribary.com/works/assessing-and-monitoring-open-pit-mine