Preliminary ESIA report for the construction of solar mini grid in Osi, Osun State

The successful execution of the project is expected to have both positive and negative
impact on the physical, chemical and biological environment of the site for the
proposed solar farm. Consequently, d-ExcelChris Renewable Energy Limited has been
consulted to prepare a Preliminary ESIA in line with the World Bank Standard,
Operational Performance Standards and International Finance Corporation (IFC), and
also the national and local regulations. The national regulation which is Nigerian EIA Act 
Cap E12LFN 2004 has been conducted thoroughly and considered to prepare this 
preliminary ESIA.
Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Dada, T. (2018). Preliminary ESIA report for the construction of solar mini grid in Osi, Osun State. Afribary. Retrieved from https://track.afribary.com/works/preliminary-esia-report-for-the-construction-of-solar-mini-grid-in-osi-osun-state-3787

MLA 8th

Dada, Tolu-tope "Preliminary ESIA report for the construction of solar mini grid in Osi, Osun State" Afribary. Afribary, 29 Jan. 2018, https://track.afribary.com/works/preliminary-esia-report-for-the-construction-of-solar-mini-grid-in-osi-osun-state-3787. Accessed 19 Nov. 2024.

MLA7

Dada, Tolu-tope . "Preliminary ESIA report for the construction of solar mini grid in Osi, Osun State". Afribary, Afribary, 29 Jan. 2018. Web. 19 Nov. 2024. < https://track.afribary.com/works/preliminary-esia-report-for-the-construction-of-solar-mini-grid-in-osi-osun-state-3787 >.

Chicago

Dada, Tolu-tope . "Preliminary ESIA report for the construction of solar mini grid in Osi, Osun State" Afribary (2018). Accessed November 19, 2024. https://track.afribary.com/works/preliminary-esia-report-for-the-construction-of-solar-mini-grid-in-osi-osun-state-3787