A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem

ABSTRACT

The hoist scheduling problem is a critical issue in the design and control of many manufacturing processes. When the hoist number and tank numbers are very large, finding an optimal schedule is very hard. As a result of this, a lot of scheduling algorithms have been developed, and thus created a need to evaluate these algorithms. This calls for a cheap and efficient way of evaluating different hoist scheduling algorithms. To address this issue, I propose a generic simulator which will be a visual tool that will be developed with Java technology. The result of this work will help to reduce cost and also help to guarantee product quality in production lines. 

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

CHIKA, E (2021). A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem. Afribary. Retrieved from https://track.afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem

MLA 8th

CHIKA, ELEONU "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem" Afribary. Afribary, 15 Apr. 2021, https://track.afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem. Accessed 24 Nov. 2024.

MLA7

CHIKA, ELEONU . "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem". Afribary, Afribary, 15 Apr. 2021. Web. 24 Nov. 2024. < https://track.afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem >.

Chicago

CHIKA, ELEONU . "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem" Afribary (2021). Accessed November 24, 2024. https://track.afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem