Design and Construction of a 5kW Turbine for a proposed micro hydroelectric Power Plant Installation at Awba Dam University of Ibadan

ABSTRACT

The design and construction of a 5kw turbine for a proposed micro hydroelectric power plant installation at Awba Dam University of Ibadan was undertaken.

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Ajuwape, T & Ismail, O (2021). Design and Construction of a 5kW Turbine for a proposed micro hydroelectric Power Plant Installation at Awba Dam University of Ibadan. Afribary. Retrieved from https://track.afribary.com/works/design-and-construction-of-a-5kw-turbine-for-a-proposed-micro-hydroelectric-power-plant-installation-at-awba-dam-university-of-ibadan

MLA 8th

Ajuwape, T and O Ismail "Design and Construction of a 5kW Turbine for a proposed micro hydroelectric Power Plant Installation at Awba Dam University of Ibadan" Afribary. Afribary, 31 Mar. 2021, https://track.afribary.com/works/design-and-construction-of-a-5kw-turbine-for-a-proposed-micro-hydroelectric-power-plant-installation-at-awba-dam-university-of-ibadan. Accessed 24 Nov. 2024.

MLA7

Ajuwape, T, O Ismail . "Design and Construction of a 5kW Turbine for a proposed micro hydroelectric Power Plant Installation at Awba Dam University of Ibadan". Afribary, Afribary, 31 Mar. 2021. Web. 24 Nov. 2024. < https://track.afribary.com/works/design-and-construction-of-a-5kw-turbine-for-a-proposed-micro-hydroelectric-power-plant-installation-at-awba-dam-university-of-ibadan >.

Chicago

Ajuwape, T and Ismail, O . "Design and Construction of a 5kW Turbine for a proposed micro hydroelectric Power Plant Installation at Awba Dam University of Ibadan" Afribary (2021). Accessed November 24, 2024. https://track.afribary.com/works/design-and-construction-of-a-5kw-turbine-for-a-proposed-micro-hydroelectric-power-plant-installation-at-awba-dam-university-of-ibadan