DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FINANCIAL MANAGEMENT SYSTEM FOR PUBLIC INSTITUTIONS (A CASE STUDY OF UNTH, ENUGU)

ABSTRACT
The proper management and utilization of financial resources has over the years been the bed rock of growth, expansion and continual existence of the world most popular industries and business organizations. In contrast, the liquidation of once popular organizations is dependent on the allocation and improper utilization of financial resources used in the running of these organization.
However, due to the inadequacies and imperfection of human beings, a lot of problems such as misappropriation, misallocation and mismanagement of financial resources, using manual and mechanical method over the years has led to the collapse of many organizations.
This work is directed towards the computerization of the already existing financial management system used in monitoring the allocation and proper utilization of financial resources used in running of the organization by ensuring faster accurate and credible financial reports as well as identifying the various problems which are inherent and encountered in the manual and mechanical methods of determining the funds to be allocated to the various working areas, (departments) in accordance to the budgetary system.
Therefore the introduction of computer would be platform on which the actualization of the design and implementation of financial management system of the case study of this project work should be achieved. 
 

TABLE OF CONTENT
Title Page
Certification
Dedication
Acknowledgement
Abstract
Table of content

CHAPTER ONE
1.0Introduction
1.1Statement of problem
1.2Purpose of study
1.3Aims and objectives
1.4Delimitation
1.5Limitation
1.6Assumptions
1.7Definition of terms

CHAPTER TWO
2.0Literature Review

CHAPTER THREE
3.0Description and Analysis of existing system
3.1Fact findings method
3.2Procedure for data collection
3.3Organizational structure
3.4Objectives of the existing system
3.5Input, Process and Output analysis
3.6Information flow diagram
3.7Problems of the existing system
3.8Justification for the new system

CHAPTER FOUR
4.0Design of the new system
4.1Output specification and design
4.2Input specification and design
4.3File design
4.4Procedure chart
4.5System flowchart
4.6System requirement

CHAPTER FIVE
5.0Implementation
5.1Program design
5.2Program flowchart

CHAPTER SIX
6.0Documentation

CHAPTER SEVEN
7.0Recommendation And Conclusion
7.1Recommendation
7.2Conclusion
References

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Research, A. (2018). DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FINANCIAL MANAGEMENT SYSTEM FOR PUBLIC INSTITUTIONS (A CASE STUDY OF UNTH, ENUGU). Afribary. Retrieved from https://track.afribary.com/works/design-and-implementation-of-a-computerized-financial-management-system-for-public-institutions-a-case-study-of-unth-enugu

MLA 8th

Research, Afri "DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FINANCIAL MANAGEMENT SYSTEM FOR PUBLIC INSTITUTIONS (A CASE STUDY OF UNTH, ENUGU)" Afribary. Afribary, 03 Feb. 2018, https://track.afribary.com/works/design-and-implementation-of-a-computerized-financial-management-system-for-public-institutions-a-case-study-of-unth-enugu. Accessed 25 Nov. 2024.

MLA7

Research, Afri . "DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FINANCIAL MANAGEMENT SYSTEM FOR PUBLIC INSTITUTIONS (A CASE STUDY OF UNTH, ENUGU)". Afribary, Afribary, 03 Feb. 2018. Web. 25 Nov. 2024. < https://track.afribary.com/works/design-and-implementation-of-a-computerized-financial-management-system-for-public-institutions-a-case-study-of-unth-enugu >.

Chicago

Research, Afri . "DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FINANCIAL MANAGEMENT SYSTEM FOR PUBLIC INSTITUTIONS (A CASE STUDY OF UNTH, ENUGU)" Afribary (2018). Accessed November 25, 2024. https://track.afribary.com/works/design-and-implementation-of-a-computerized-financial-management-system-for-public-institutions-a-case-study-of-unth-enugu