ABSTRACT This research determined the relationship between financial resource management and social infrastructure projects among UN Agencies and NGOS in Hargeisa, in Somaliland. As specific objectives, this study was set; to determine the profile of respondents; to determine the effectiveness of financial resource management among UN Agencies and NGOs in Hargeisa; to determine the effectiveness in implementation of social infrastructure projects among NGOS and UN Agencies; to compare if there is significant relationship between the two study variables. The researcher employed descriptive correlation design and used SLOVEN’s formula to determine a sample size of 200 from a target population of 400, Sampling was done using systematic random sampling technique. Information was obtained from respondents through self-administered questionnaires and validity and reliability of instruments was determined through content validity index and pretesting. The researcher followed all the ethical considerations of research. Data was analyzed in both qualitative and quantitatively using statistical techniques such as frequency, percentages, mean and correlation matrix as well as regression matrix. Findings indicated that the financial resource management in the selected NGOS and UN Agencies was generally effective; implementation of Social Infrastructure Projects was also found to be effective ; significant difference in level of effectiveness of financial resource management was noted and level of significance of .The study concluded that there is a positive significant relationship between financial resource management and implementation of social infrastructure projects. The study recommends that improvement in internal auditors’ independence; flow of cash management in different departments and evaluating accounting officers’ performance; incorporation of procedures for monitoring the performance and strategies.
TABLE OF CONTENTS
Preliminaries
DECLJRATION A
DECLARATION B ii
DEDICATION iv
ACKNOWLEDGEMENT v
LIST OF ACRONYMS AND ABBREVIATION vi
TABLE OF CONTENTS vii
LIST OF TABLES viii
ABSTRACT ix
CHAPTERPAGE
ONE THE PROBLEM AND ITS SCOPE1
Background of the Study 1
Statement of the Problem 4
Purpose of the Study 4
Research Objectives 5
Research Questions 6
Research Hypotheses 6
Scope of the Study 7
Significance of the study 9
Operational definitions of key terms 11
TWO REVIEW OF RELATED LITERATURE
Concepts, Ideas, Opinions from Experts / Authors 12
Theoretical perspective 24
Related Studies 26
THREE METHODOLOGY
Research Design 31
Research Population 31
Sample Size 32
Sample Procedure 33
Research Instrument 33
Validity and Reliability of Instruments 34
Data Gathering Procedures 36
Data Analysis 37
Ethical Consideration 38
Limitations of the Study 39
FOUR PRESENTATION, ANALYSIS AND INTERPRETATION
OF DATE
Demographic information of the respondents 41
Description of the independent variable 45
Description of dependent variable59
Testing relationship between variables 53
Regression model analysis 56
FIVE SUMMARY OF FINDINGS, CONCLUSIONS AND
RECOMMENDATIONS
Summary of Findings 58
Conclusions 60
Recommendations 61
Refferences 63
APPEDICES
APPENDIX 1 A: TRANSMITTAL LETTER 66
APPENDIX 1B: TRANSMITTAL LETTER FOR THE RESPONDENTS 67
APPENDIX II: CLEARANCE FROM ETHICS COMMITTEE68
APPENDIX III: INFORMED CONSENT 69
APPENDIX IVA: FACE SHEET 70
APPENDIX IVB:QUESTIONNPJRE TO DETERMINE
EFFECTIVENESSOF FINANCIAL RESOURCE
MANAGEMENT 71
APPENDIX IVC: QUESTIONNARE TO DETERMINE
EFFECTIVENESS OF SOCIAL INFRASTRUCTURE
PROJECTS 73
APPENDIX V: PROPOSAL DATA PRESENTATION
THROUGHTABLES/GRAPHICS 74
APPENDIX VI: PROPOSAL BUDGET 76
APPENDIX VII: TIME FRAME 77
APPENDIX VIII: RESEARCHE’S CURRICULUM VITEA 78
Research, S. (2022). Financial Resource Management and Social Infrastructure Projects in Selected Ngos and Un Agencies in Hargeisa Somali Land. Afribary. Retrieved from https://track.afribary.com/works/financial-resource-management-and-social-infrastructure-projects-in-selected-ngos-and-un-agencies-in-hargeisa-somali-land
Research, SSA "Financial Resource Management and Social Infrastructure Projects in Selected Ngos and Un Agencies in Hargeisa Somali Land" Afribary. Afribary, 27 Sep. 2022, https://track.afribary.com/works/financial-resource-management-and-social-infrastructure-projects-in-selected-ngos-and-un-agencies-in-hargeisa-somali-land. Accessed 23 Nov. 2024.
Research, SSA . "Financial Resource Management and Social Infrastructure Projects in Selected Ngos and Un Agencies in Hargeisa Somali Land". Afribary, Afribary, 27 Sep. 2022. Web. 23 Nov. 2024. < https://track.afribary.com/works/financial-resource-management-and-social-infrastructure-projects-in-selected-ngos-and-un-agencies-in-hargeisa-somali-land >.
Research, SSA . "Financial Resource Management and Social Infrastructure Projects in Selected Ngos and Un Agencies in Hargeisa Somali Land" Afribary (2022). Accessed November 23, 2024. https://track.afribary.com/works/financial-resource-management-and-social-infrastructure-projects-in-selected-ngos-and-un-agencies-in-hargeisa-somali-land