ABSTRACT
Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. Analysing various project management activities and their synergy between each other have studied. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track, discussed in the research KEYWORDS : COVID-19, Project delivery
Rithik, R. (2020). Overcoming the Impact of Covid-19 Outbreak Using Value Integrated Project Delivery Model. Afribary. Retrieved from https://track.afribary.com/works/overcoming-the-impacts-of-covid-19-outbreak-using-value-integrated
Rithik, Ramya "Overcoming the Impact of Covid-19 Outbreak Using Value Integrated Project Delivery Model" Afribary. Afribary, 27 Aug. 2020, https://track.afribary.com/works/overcoming-the-impacts-of-covid-19-outbreak-using-value-integrated. Accessed 27 Nov. 2024.
Rithik, Ramya . "Overcoming the Impact of Covid-19 Outbreak Using Value Integrated Project Delivery Model". Afribary, Afribary, 27 Aug. 2020. Web. 27 Nov. 2024. < https://track.afribary.com/works/overcoming-the-impacts-of-covid-19-outbreak-using-value-integrated >.
Rithik, Ramya . "Overcoming the Impact of Covid-19 Outbreak Using Value Integrated Project Delivery Model" Afribary (2020). Accessed November 27, 2024. https://track.afribary.com/works/overcoming-the-impacts-of-covid-19-outbreak-using-value-integrated