LITERATURE REVIEW
2.1.contracts
3 2.2. Construction contract
2.3. Element of a contracts
2.4. The majority of road construction challenge
2.4.1. Construction planning, administration, and management
2.4.2. Construction contracts methods
2.4.3. Types of construction contracts
2.5. Condition of Contracts for Construction: An assessment of the challenges in conditions of contract management issue in roads construction projects at DDCARA, Ethiopia. 2023G.C
2.6. Challenges of Contract Management
2.7. Roles and Responsibilities of parties of a Construction Contract2.8. Contract administration
2.9. General conditions of a contract/contract form/
2.10. Project and Project Management
2.11. Contract Management
2.12. Contract Management Theories
2.12.1. Contract Compliance Theory
2.12.2. Contract Management Theory
2.12.3. The Principal-Agency Theory
2.124. The Will Theory
2.13. The Contract Management Process
2.13.1. Establishing the form of Contract
2.13.2. Terms and Conditions of Good Contracts
2.13.3. Empirical Literature Review
2.14. Contract Conditions and Price Adjustment Clauses
2.15. Research gap identification
41 CHAPTER THREE
RESEARCH METHODOLOGY
3.1 Introduction
3.2 . Study Area
3.3. Study Population
3.4. Study type
3.4.1. Study Design
3.5 Sampling Procedure, Frame, Unit and Procedures
3.6 Description Variables
3.6.1. Dependent variable
4 An assessment of the challenges in conditions of contract management issue in roads construction projects at DDCARA, Ethiopia. 2023G.C
3.6.2. Independent variable
3.7 Methods of Data Collection
3.8. Ethical Consideration
3.9. Expected Outcomes
3.10 Data Processing and Analysis
CHAPTER 4 WORK PLAN
CHAPTER 5 BUDGET OF THE PROJECT
REFERENCES
Adem, A. & Hussein, A (2024). Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia. Afribary. Retrieved from https://track.afribary.com/works/proposal-for-ahmed23-final
Adem, Ahmed, and Ahmed Hussein "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia" Afribary. Afribary, 05 Feb. 2024, https://track.afribary.com/works/proposal-for-ahmed23-final. Accessed 06 Nov. 2024.
Adem, Ahmed, and Ahmed Hussein . "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia". Afribary, Afribary, 05 Feb. 2024. Web. 06 Nov. 2024. < https://track.afribary.com/works/proposal-for-ahmed23-final >.
Adem, Ahmed and Hussein, Ahmed . "Proposal on: An Assessment of Challenges in Conditions of Contract Management Issue in Roads Construction Projects at Dire Dawa City Road Authority, Ethiopia" Afribary (2024). Accessed November 06, 2024. https://track.afribary.com/works/proposal-for-ahmed23-final